ELM Surfacing
ELM Surfacing
    
Home About Us Divisions Accreditation News Gallery Contact Us



Surfacing Civil Engineering Milling Grab and Plant Hire Surface Treatments

Surfacing and Reinstatement

Reinstatement

We have built the whole company around the successful and reliable reinstatement service that we provide to all of our clients and customers. We can provide 24-7 coverage and can do anything from a patch in the footway to full width carriageway reinstatement, be it commercial, private or even specialist works. We have a vast range of vehicles and machinery which enables us to cater for every eventuality with black or white top reinstatement operatives. Elm Surfacing Ltd have also been on the local authorities list of approved contractors for a substanciall period of time which enables us to carry out vehicle crossing alterations and have a proven track record with absolutely no come backs,on top of this we have gained accreditation from Kent County Council to carry out Section 278 developer funded schemes in the highway. If you would like any more information on the above please contact the office number found below or fill out the contact us application form and we will reply as soon as possible.

Surfacing

As a Division offering a single point of contact for major term contracts or acting independently on any size surfacing schemme, the Surfacing Division provides the full range of highway surfacing, including anti-skid and colour coded. The Division has also a great deal of experience in the utilisation of 'Quiet Road' and 'Thin Surfacing' materials. The Surfacing Division's reputation within the industry ensures that a full order book is maintained with clients including local authorities, developers, private clients, plus other building and civil engineering companies. Again as in every division of our company we have a well maintained, carefully considered variety of machinery and back up equipment allowing us to undertake paving widths from as narrow as 1.1 meters up to a width of 4.8 meters.

 



  • images/reinstatement/reins1.jpg

    Surfacing
  • images/reinstatement/reins2.jpg

    Surfacing
  • images/reinstatement/reins3.jpg

    Surfacing
  • images/reinstatement/reins4.jpg

    Surfacing
  • images/reinstatement/reins5.jpg

    Surfacing
  • images/reinstatement/reins6.jpg

    Surfacing
  • images/reinstatement/reins7.jpg

    Surfacing
  • images/surf/surfacing1.png

    Surfacing
  • images/surf/surfacing2.jpg

    Surfacing
  • images/surf/surfacing3.png

    Surfacing
  • images/surf/surfacing4.jpg

    Surfacing
  • images/surf/surfacing5.jpg

    Surfacing
  • images/surf/surfacing6.jpg

    Surfacing
  • images/surf/surfacing7.jpg

    Surfacing
  • images/surf/surfacing8.jpg

    Surfacing
  • images/surf/surfacing9.jpg

    Surfacing
  • images/surf/surfacing10.jpg

    Surfacing
  • images/surf/surfacing11.jpg

    Surfacing
  • images/surf/surfacing12.jpg

    Surfacing
  • images/surf/surfacing13.jpg

    Surfacing
  • images/surf/surfacing14.jpg

    Surfacing
  • images/surf/surfacing15.jpg

    Surfacing
  • images/surf/surfacing16.jpg

    Surfacing
  • images/surf/surfacing17.png

    Surfacing